Commercial

Industrial Complex Solar

Montreal, QC
200 kW System
Completed November 2023

Large industrial facility solar installation reducing operational costs significantly.

Share this project:
Industrial Complex Solar
1 / 3
200 kW
System Size
500
Solar Panels
240,000 kWh
Annual Production
25 years
Warranty

The Challenge

High energy consumption facility needed substantial cost reduction without production interruption.

Our Solution

Phased installation approach allowed continued operations while installing 200 kW solar array.

Results Achieved

  • $35,000 annual savings
  • 35% energy cost reduction
  • Zero production downtime
  • 3.5-year payback period

Installation Timeline

From consultation to activation

1-2 weeks

Consultation & Design

Initial site assessment, energy analysis, and custom system design

1
2-4 weeks

Permits & Approvals

Securing all necessary permits and utility approvals

2
1-3 days

Installation

Professional installation of panels, inverters, and electrical systems

3
1-2 weeks

Inspection & Commissioning

Final inspections, testing, and system activation

4
4-8 Weeks
Typical Total Project Duration

Environmental Impact

Making a difference for our planet

31.2 tons
CO₂ Offset Annually

Reducing greenhouse gas emissions equivalent to removing cars from the road

1560
Trees Planted

Carbon absorption equivalent to planting and growing mature trees

6.8
Cars Off the Road

Equivalent to removing gasoline-powered vehicles from the road for a year

Additional Benefits

100%
Clean Energy
0
Air Pollution
0
Water Usage
25+
Years Production
Produces
240,000 kWh/year
Offsets
31.2 tons CO₂

Ready for Your Own Solar Installation?

Let us design a custom solar solution for your property. Get a free quote and join hundreds of satisfied customers across Canada.